Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.8215772
![](http://i.b2b168.com/e/tag_pthy.gif)
- Product Categories
- Friendly Links
Information Name: | Supply electroplating industry corrosion resistant construction |
Published: | 2012-06-03 |
Validity: | 300 |
Specifications: | longkang |
Quantity: | 0.00 |
Price Description: | |
Detailed Product Description: | The Anticorrosion construction program 1, Introduction to construction This project is the surface of the plating pool brushing fiberglass three fabrics and five oil. Corrosion engineering construction is divided into the following steps: 1, ready to work: (1) pre-construction to ensure that the concrete floor to completely dry the basis of formation, and then to base oil brushing. ② prepare construction required FRP raw materials and construction equipment. 2, the specific construction procedure for the three fabrics and five oil primer again to be solidified and then brush again preservative resin, glass cloth layer, painted again, glass cloth layer, coated again last painted anti-corrosion of glass cloth layer The resin will cover can be. 3, finished Protection: pool irrigation class, the construction environment is not conducive to the curing of the anti-corrosion resin forming, it is necessary to require 48 hours of curing time, can be used until completely cured. Two, the construction plan is as follows in the number of 1, the professional anti-corrosion construction workers 2, one of foreman (construction tools to bring your own) Third, the construction quality requirements 1, according to the actual on-site to do a good job in all aspects of construction work, mutual inspection and special inspection in order to meet quality requirements. 2, during the construction period and construction personnel to be responsible for their own work, continuously improve the quality of work. Fourth, the fire safety measures Raw materials used in construction for flammable substances, all construction workers to enter the scene are not smoking, No smoking. 2, the construction workers to enter the site to comply with the rules and regulations, and obey the foreman arrangements. During brushing enamel site must have a fan to send a new wind to keep the pool fresh air or wear gas masks in order to better construction. FRP construction process First, the operating conditions Construction ambient temperature to 5-25 ° C is appropriate, relative humidity less than 8% fiberglass construction strict check whether the formation of ground-based construction because construction ring actually in the basement so necessary in the ground is not completely dry with ventilation and low-voltage lighting. Second, the concrete base surface requirements The concrete surface should be solid, dense, smooth, there should be from the sand, from the shell, crack phenomenon. Pool the inner wall of the foundation concrete time wiping the yin and yang should be made of beveled or rounded corners, angle in order to achieve the purpose of convenience of construction. Third, the process operation 1, the preparation of anti-corrosion resin resistant container should be kept clean, dry and free of grease. 2, the preparation of rubber each preparation should be based on engineering capacity and operating number may be used with the distribution. , Brushing layers of glass cloth to three times, first brushing finished second over the process, followed by construction to the topcoat finished. Completely cured topcoat, you can use. Fourth, the quality requirements An FRP anti-corrosion construction after surface of uniform color, seamless coated bubbles and other phenomena. 2, corrosion-resistant surface smooth, and enhanced layer of concave and convex part of the height difference should not exceed 20% of wall thickness. Fifth, the finished product protection 1, does not allow the coating on the strength check, so as not to adversely affect the test hole to finished product. But with the acid and alkali material drops sprinkled on the surface for corrosion resistance testing. 2, to prevent welding sparks out to be located in the finished surface, if contact liner or iron as protection. Shelf life: the shelf life of the construction project quality are of one year. |
Admin>>>
You are the 21369 visitor
Copyright © GuangDong ICP No. 10089450, Mechanical & Electrical Equipment Co., Ltd. Hainan Long Kang All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21369 visitor
Copyright © GuangDong ICP No. 10089450, Mechanical & Electrical Equipment Co., Ltd. Hainan Long Kang All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility